Conservatory Rebuild The final Stages 1
We're almost there. In coding terms you'd say we were 80% done as it sounds like you've almost finished. The fact that it might take just as long (or longer) to get the final 20% done is never really mentioned ...
There are floor tiles:

Guttering and a soak-away for drainage (the soak-away is the length of the border but you would never know - I'm impressed with how well they did that):

The toilet and sink are in, and we have lights and plug sockets (not quite finished):

As you can see we need tiling in the cloak room, plastering on one of the walls and a door for the toilet. All supposed to be happening over the next few weeks...